DataSet	Hole_ID	Hole_Type	Extension_Type	Wedge_Depth	Parent_Hole_ID	Year	EOH	Ref_System	Ref_Method	Ref_Accuracy	UTM_East	UTM_North	UTM_RL	UTM_Grid	Lat	Long	LL_Datum	Local_East	Local_North	Local_RL	Local_Grid_Name	Project	Prospect	Tenement_No	Date_Commenced	Date_Completed	Casing_Type	Casing_Depth_From	Casing_Depth_To	Casing_Diameter	Watertable_Depth_m	Groundwater_Quality	Company	Drilling_Company	Drill_Rig	Logged_By	Sampled_By	Purpose	Termination_Reason	Mineralisation	Best_Intersections	Data_Source	Rehab	Comments	Validation_Comments	DBA_Validated_By	Geo_Validated_By	Load_Stamp
CENTRALMTREAD	SBD01	DD				1982	221	Local		30	375955	5378540	172	AGD66_55				-110	-35	170	Bastyan Dam	Marionoak	Bastyan Dam	EL 22/1974	27/08/1982	09/09/1982	Steel rods	0	6.5	NW			Shell	Longyear	BB51	WDS		Test gravity/IP and outcropping mineralisation	Tested target zone	Veins style mineralisation	"182.35-182.45m, 0.1m @ 1.7% Pb, 12.0% Zn"	TCR83-2044		"Collar location measured from plan D/NL01/079 at 1:5,000"				
CENTRALMTREAD	180H/1	DD				1984	101	Local			375990	5373503	165	AMG66_55				5170	5480			East Renison		EL 5/1963	13/12/1984								Comstaff	Overland	Warman Scout			To test the 180H DIGHEM anomaly that had positive follow-up ground geophyiscal responses and was broadly reprensentative of many of the local DIGHEM responses				TCR85-2419		"Coordinates scaled off plan TAS/2/4174, 1:2500 (TCR85-2419)"				
CENTRALMTREAD	180H/2	DD				1985	120	Local			376586	5373209	135	AMG66_55				5820	5320			East Renison		EL 5/1963	02/01/1985	11/01/1985							Comstaff	Overland	Warman Scout			To test the 180H DIGHEM anomaly that had positive follow-up ground geophyiscal responses and was broadly reprensentative of many of the local DIGHEM responses				TCR85-2419		"Coordinates scaled off plan TAS/2/4174, 1:2500 (TCR85-2419)"				
